Hi,
Having an extenstion built at the moment and already have an insulated slab down. To get up to FFL I will need approx 60mm of screed but as I understand it takes 1 day per 1mm to dry. I really don't want to wait 60 days before I can start to fit my new kitchen so I am looking for an alternative. The finished floor will be covered with vinyl flooring. I was thinking a leveled timber frame covered in chipboard flooring to match the FFL of the rest of the house perhaps??
Many Thanks
Mike
Having an extenstion built at the moment and already have an insulated slab down. To get up to FFL I will need approx 60mm of screed but as I understand it takes 1 day per 1mm to dry. I really don't want to wait 60 days before I can start to fit my new kitchen so I am looking for an alternative. The finished floor will be covered with vinyl flooring. I was thinking a leveled timber frame covered in chipboard flooring to match the FFL of the rest of the house perhaps??
Many Thanks
Mike