Hi,

Having an extenstion built at the moment and already have an insulated slab down. To get up to FFL I will need approx 60mm of screed but as I understand it takes 1 day per 1mm to dry. I really don't want to wait 60 days before I can start to fit my new kitchen so I am looking for an alternative. The finished floor will be covered with vinyl flooring. I was thinking a leveled timber frame covered in chipboard flooring to match the FFL of the rest of the house perhaps??

Many Thanks

Mike
 
Use a dehumidifier. Once the screed is a light grey in about five days, you can carry on
 
I've heard "forcing" the drying time can lead to bubbling or cracking. True??

Mike
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top