- Joined
- 27 Mar 2018
- Messages
- 2
- Reaction score
- 0
- Country
Hi, I currently have square aluminium down pipes that are cemented in the ground going into a gulley to the drain. I want to replace these with upvc downpipes. What I need advice on is : Can I just dig these out and replace with upvc downpipes and re cement in or is it best to cut aluminium pipes as close to ground as possible and join the 2 together
Thanks
Thanks