Another Supp. Bonding Question

Joined
19 Jan 2006
Messages
561
Reaction score
32
Location
Wiltshire
Country
United Kingdom
Hi All,

Recently-ish moved into a new flat, found many a dodgy DIY attempts so far!

My latest find is the shower has no supplementary bonding at all. Using my DMM, I have found there is currently 15K between the CPC and the incoming cold water feed. Negligible AC though.

The cold feed is tapped, almost directly from the main incomer, via soldered and compression joints, then, there is a plastic Hep2o (spelling?) type straight through joint - across this is where I find my 15K.

As the bathroom end is all finished and tiled, would it be acceptable (bit of a long shot I think) to bond between the CPC and the compression elbow within the shower itself? If it will fit of course, or will I have to rip it all apart.

Ta in advance.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top