Armoured cable termination

When you are down stream of an RCD, having further RCDs or RCBOs is completely pointless

But you’d know this if you had competence
 
You could gland off into an external box at low level, strip the swa really long and run up to the Dist Board in flexi conduit, maybe with a seperate extra earth wire to allow bonding the armour, within the partition wall, that would leave the gland accessible and no unnecessary joints
 
You could gland off into an external box at low level, strip the swa really long and run up to the Dist Board in flexi conduit, maybe with a seperate extra earth wire to allow bonding the armour, within the partition wall, that would leave the gland accessible and no unnecessary joints
It would need rcd protection doing it that way.
 
yes it does, i believe the op said there was already an rcd at the source
I had another idea after reading yours, do what you said but install the swa inner inside a galvanised trunking inside the wall? No rcd protection needed then.
 
Last edited:

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top