Probably an easy one for you but I’m new to al of this DIYery! With a little help from friend I’m redoing the bathroom, replacing the suite and retiling….now the ‘difficulty’ as said friends – both relatively experienced DIYers have a difference of opinion.
One says that after stripping all the old tile and prepping the wall etc, the new suite should be installed and then the new tiling done…the other says the new tiling should be done and then the bathroom suite fitted as it seals better – personally I’m non the wiser so I’m looking for wiser heads (that’s you lot by the way!) to solve the argument!!
One says that after stripping all the old tile and prepping the wall etc, the new suite should be installed and then the new tiling done…the other says the new tiling should be done and then the bathroom suite fitted as it seals better – personally I’m non the wiser so I’m looking for wiser heads (that’s you lot by the way!) to solve the argument!!