Hi all I've had a base completed for an extension 6x4m (raft upto subbase)I plan to finish the extension myself my first job is installing the floor slab. But the builders have left me with 4 courses of engineers built around the perimeter. I need to do an inner leaf of block work so I can put down the insulation board. And pour concrete and screed but I'm 325mm from subfloor to existing dpm. Therefore my blocks won't be level with the 4 courses I've been left. Can I run a row of engineers around sub base first then my block to achieve the optimum level to finish the slab.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top