Hi
Is it ok to use 4" single leaf blockwork sitting on strip foundations as permanent shuttering for pouring a concrete base? Would it need any extra horizontal support other than the mortar holding it in place? The base is to be 6.2m x 3.2m and 6" deep.
Thanks