i've just been to give a quote for a rewire of a three bed house.
The owner wants to turn one of the bedrooms into a bathroom. However the combi boiler is in a cupboard in this bedroom and is staying. The power for this is fed via fused spur in this cupboard. Is this allowed? And does it need cross bonding if everything is on a RCD?
Thanks.
The owner wants to turn one of the bedrooms into a bathroom. However the combi boiler is in a cupboard in this bedroom and is staying. The power for this is fed via fused spur in this cupboard. Is this allowed? And does it need cross bonding if everything is on a RCD?
Thanks.