L
live4weekends
need to pour 1.2m of concrete for floor slab inside (almost) finished house extension - there is a valid reason for not doing the oversite in this room before this stage, before anyone asks
the truck could back up to front door but the room is around a 90 degree corner perhaps a couple of metres in total. I was thinking of knocking up a chute out of some plywood and lining it with spare DPM to help it flow better.
anything I should worry about here, apart from making sure the structure is strong enough?
the truck could back up to front door but the room is around a 90 degree corner perhaps a couple of metres in total. I was thinking of knocking up a chute out of some plywood and lining it with spare DPM to help it flow better.
anything I should worry about here, apart from making sure the structure is strong enough?