I'm about to submitted to building control for our loft conversion.
I have a lot of detail required, the structural engineer has done all the necessary calculations and drawings for the steels, new floor, roof structure, insulation, stairs and velux's. These are all shown on drawings.
I plan to change all doors to fire doors, except the new ensuite in the loft and the current ensuite which will eventually become the family bathroom, and protect the stairway/landings etc for route of escape (all existing internal walls are masonry, the only stud work will be around the new stairs and in front of the party wall in the loft. I will use fireline p.board here).
These details aren't on drawings along with other details such as electrics (I will have linked and wired smoke alarms), plumbing and ventilation (extractor in new en-suite).
Plumbing and electrics will be done by qualified professionals who can sign off their own work.
My question is this, do I:
submit a building notice with some additional information
or
submit full plans with some information missing?
I will include a cover note explaining what will be provided but not show a detailed plan.
All thoughts and experiences appreciated.
I'm about to submitted to building control for our loft conversion.
I have a lot of detail required, the structural engineer has done all the necessary calculations and drawings for the steels, new floor, roof structure, insulation, stairs and velux's. These are all shown on drawings.
I plan to change all doors to fire doors, except the new ensuite in the loft and the current ensuite which will eventually become the family bathroom, and protect the stairway/landings etc for route of escape (all existing internal walls are masonry, the only stud work will be around the new stairs and in front of the party wall in the loft. I will use fireline p.board here).
These details aren't on drawings along with other details such as electrics (I will have linked and wired smoke alarms), plumbing and ventilation (extractor in new en-suite).
Plumbing and electrics will be done by qualified professionals who can sign off their own work.
My question is this, do I:
submit a building notice with some additional information
or
submit full plans with some information missing?
I will include a cover note explaining what will be provided but not show a detailed plan.