Hi all.
I have been granted planning and works have started. The planner rejected plans that the side extension bridge line be 350mm lower than existing and the front be stepped back a brick.
The builders have built up to damp at the front and its flush with existing house. Building inspector has been out and they have had a conversation that's it's ok to build flush and tie the new roof in. Builder assures me that it's fine. But I am concerned that planners will have an issue at a later date ie completed then year apart the extension to match the submitted drawing. Please Help !!!!!!!!
I have been granted planning and works have started. The planner rejected plans that the side extension bridge line be 350mm lower than existing and the front be stepped back a brick.
The builders have built up to damp at the front and its flush with existing house. Building inspector has been out and they have had a conversation that's it's ok to build flush and tie the new roof in. Builder assures me that it's fine. But I am concerned that planners will have an issue at a later date ie completed then year apart the extension to match the submitted drawing. Please Help !!!!!!!!