Cable and pipe management for concrete floor conversion

Joined
9 Apr 2021
Messages
9
Reaction score
0
Country
United Kingdom
Hi I am currently considering converting my ground floor (suspended timber) into a solid insulated concrete floor for UF heating. The depth from the top of the joists to the bottom of the void (concrete) is 10" I already have a plan to tackle most of the conversion but I'm unsure about what to do with the pipes and cables currently in the void. I read somewhere that they have to be sealed into pipes before the concrete is laid?

Does anybody have experience or resources that can help to explain how it's done?
Or who I would call about getting it done?

Thanks in advance.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top