I only started training in September so sorry if this is a dumb question!
If you’re running a cable vertically in a studded wall (before the plasterboard is fitted) to an accessory what do you do when you come to a noggin? Do you notch-out or drill a hole so that from the side of the wall that doesn’t have the accessory the cable is more than 50mm deep (so no need to protect it) i.e for a 100mm wide noggin drill about 30mm in from the accessory side?
Thank you.
If you’re running a cable vertically in a studded wall (before the plasterboard is fitted) to an accessory what do you do when you come to a noggin? Do you notch-out or drill a hole so that from the side of the wall that doesn’t have the accessory the cable is more than 50mm deep (so no need to protect it) i.e for a 100mm wide noggin drill about 30mm in from the accessory side?