Or anyone really.
Anyone have any current info/gas regs, regarding bonding commercial boilers and pipework.
The gas engineers have said, the boiler pipework is NOT supplementary bonded beneath the gas boilers at various sites.
The only electrical regs I can find is that heating systems should be bonded to the MET, which I assume is only if it is an extraneous-conductive part.
411.3.1.2 (v).
The gas and water bonded (at source) 411.3.1.2 (i) and (ii).
Still awaiting for the surveyors reply, but would like to gen up ready for there reply.
Anyone have any current info/gas regs, regarding bonding commercial boilers and pipework.
The gas engineers have said, the boiler pipework is NOT supplementary bonded beneath the gas boilers at various sites.
The only electrical regs I can find is that heating systems should be bonded to the MET, which I assume is only if it is an extraneous-conductive part.
411.3.1.2 (v).
The gas and water bonded (at source) 411.3.1.2 (i) and (ii).
Still awaiting for the surveyors reply, but would like to gen up ready for there reply.