Hi,
We're redoing our bathroom, wondered if I can do it in this order:
Turn off water
remove bathroom suite
remove all tiles & plasterboard
put caps on pipes
remove chipboard floorboard replace with 18mm WBP plywood
install bath ready to use next week.
Going forward we'd install plasterboard walls / tiles then WC and basin.
Thanks for your help, (ps im a DIY novice I'm sure it shows)
Mark
We're redoing our bathroom, wondered if I can do it in this order:
Turn off water
remove bathroom suite
remove all tiles & plasterboard
put caps on pipes
remove chipboard floorboard replace with 18mm WBP plywood
install bath ready to use next week.
Going forward we'd install plasterboard walls / tiles then WC and basin.
Thanks for your help, (ps im a DIY novice I'm sure it shows)
Mark