It's possible the DPC is lower than I think, i'll be able to confirm in a couple days. If there is an issue with it i'll have to call the builder responsible for the shell, however likely not a lot that can actually be done about it now if the DPC level is wrong.
In any case, I still have the bifold height to deal with. I can step over it to get out, or have a near flush threshold internally by having a floating floor ontop of the joists, instead of insulation between. Is this acceptable BC wise or would there be issues? In my head it's basically the same as a warm roof - would be the same cost in material as between joists, but so much easier labour wise and gets rid of the height issue. Possible better performance too with no bridging.