I have had my quary tiles lifted to find crumbling top layer of concrete underneath concrete was ok. Its the been screeded with sand and cement left overnight to dry and next day its had laybond screedmaster ultimate put over it. I have a few concerns
1.the council did not use a dpm under the screed he did put a bag infront of the living and dining room doors and screeded over them will this cause any problems no dpm and his bag method?
2.is it ok to use levelling compound before screed dry?
3 they did not prime the screed will that have problems?
4 they have missed some small patches I went out and bought some of the same stuff I got the milk and powder can I mix it up and relay over mossed areas and areas I think require it? Bearing in mind it is dry now
5. Should I primer it or do a bonding coat ? With what if so?
1.the council did not use a dpm under the screed he did put a bag infront of the living and dining room doors and screeded over them will this cause any problems no dpm and his bag method?
2.is it ok to use levelling compound before screed dry?
3 they did not prime the screed will that have problems?
4 they have missed some small patches I went out and bought some of the same stuff I got the milk and powder can I mix it up and relay over mossed areas and areas I think require it? Bearing in mind it is dry now
5. Should I primer it or do a bonding coat ? With what if so?