I'm hoping someone could advise us on what the best course of action is, we have approved plans for a wrap around single story extension to our bungalow, we are on a sloping plot so the height difference at the back door to ground level is around 0.8m, we have the attached design approved with a raised patio and steps leading down to the garden.
We would like to change this by adding raised flower beds along the back of the house, first one at floor level, dropping by 0.4 then dropping again to ground level with steps and a pathway going through them so that we can gradually step down into the garden rather than a sheer drop.
This is the plan we would like;
We think this may be a non material amendment but are not sure, friends have said raised beds do not need permission as they are not a platform and you will not raising the ground level. We will be having steps and a ramp/pathway through the middle which will be higher than ground level so i think it needs permission.
Could anyone advise on the best course of action, the builders are due to start in 4 weeks and want to do the foundations for the steps and wall at the start of the build.
Many thanks.
I'm hoping someone could advise us on what the best course of action is, we have approved plans for a wrap around single story extension to our bungalow, we are on a sloping plot so the height difference at the back door to ground level is around 0.8m, we have the attached design approved with a raised patio and steps leading down to the garden.
We would like to change this by adding raised flower beds along the back of the house, first one at floor level, dropping by 0.4 then dropping again to ground level with steps and a pathway going through them so that we can gradually step down into the garden rather than a sheer drop.
This is the plan we would like;
We think this may be a non material amendment but are not sure, friends have said raised beds do not need permission as they are not a platform and you will not raising the ground level. We will be having steps and a ramp/pathway through the middle which will be higher than ground level so i think it needs permission.
Could anyone advise on the best course of action, the builders are due to start in 4 weeks and want to do the foundations for the steps and wall at the start of the build.
Many thanks.