Hello all,
I am looking to install a CXC 50/100 3000mm Catnic...
I would be immensly greatful of tips, must and must nots....
I have block and brick construction, joists sit at 350mm intervals an onto block. The gap is 2700mm, structural diagram states engineering bricks of 450mm x 215mm padstones.
I intend to have internal acros on scaffold boards and external strongboys. How many would I need of each and distance apart? I know to sit it on bed of mortar and support when set prior to soldier course. How do I tie padstones to existing brick?
Really appreciate and constructive replys, more info the better for me
I am looking to install a CXC 50/100 3000mm Catnic...
I would be immensly greatful of tips, must and must nots....
I have block and brick construction, joists sit at 350mm intervals an onto block. The gap is 2700mm, structural diagram states engineering bricks of 450mm x 215mm padstones.
I intend to have internal acros on scaffold boards and external strongboys. How many would I need of each and distance apart? I know to sit it on bed of mortar and support when set prior to soldier course. How do I tie padstones to existing brick?
Really appreciate and constructive replys, more info the better for me