got to the end of my 6mx3m exstension,looks gr8. had the flat warm roof felted and put the lead flashing on myself,expecting the b.c 2moro to sign off but looked at my plans before and didnt realise i need cavity trays putting in. s***. was realy pleased with myself till then. will b.c insist on them. school boy error.