- Joined
- 15 Feb 2003
- Messages
- 56
- Reaction score
- 0
- Country
i am digging out and filling with concrete 4 holes which are a base for a kiddies activity centre. can i use a concrete drymix - do i add water ?-or leave to the elements.There are brackets which are attached to the bottom of the activity centre which need to be embedded in the concrete
any thoughts on the project are welcomed
thanks
Pete
any thoughts on the project are welcomed
thanks
Pete