I'm building a concrete base that will have 75-100mm concrete depth
The area is 9 square metres
Is this too much of an area to mix using a cement mixer rather than getting ready mixed delivered?
How long will concrete last in terms of being able to manipulate it so that i can tamp it down level
Any tips to get a perfectly level base other than shuttering with timber and using a timber edge?