- Joined
- 13 Dec 2022
- Messages
- 58
- Reaction score
- 1
- Country
So I'm having a 12cm slab poured next week ready for me to continue building up the next layers of PIR insulation, installing and pressure testing ufh and then have screed pumped in. How long will I need to leave the slab until I can start on the next steps do you think? I.e. dropping 150mm pir over it, slip layer and stapling down ufh pipes?