I've had a 'builder' pour a slab for a shed and honestly it's the worst job I've ever seen. Usually I would have done it myself but didn't have time.
The top is too uneven to simply screed over, so I'm plannig to a pour about 30 to 50mm depth over the top.
Obviously never had to do this before.
Do I need to prepare the top of the slab with anything for the new concrete and is 30 to 50mm ok?
Thank you.
The top is too uneven to simply screed over, so I'm plannig to a pour about 30 to 50mm depth over the top.
Obviously never had to do this before.
Do I need to prepare the top of the slab with anything for the new concrete and is 30 to 50mm ok?
Thank you.