Morning everyone
I need to connect a new 40mm sink waste into this soil stack - due to the fall I need I need to do this in amongst the existing connections. I’d originally thought I could use a strap boss just above the existing joints - at about the 23” mark on the level. But because of the fall I need I need to join lower.
There is an old inlet on the right but this looks to have been filled with mortar or something a long time ago. Don’t much fancy drilling into this. There’s a bit of space on the main pipe under this too - is that enough for the strap boss?
At some point I’ll renew the whole stack - but don’t have the cash to do that right now and this new connection is kind of urgent…
Any suggestions?
Many thanks
Keith
I need to connect a new 40mm sink waste into this soil stack - due to the fall I need I need to do this in amongst the existing connections. I’d originally thought I could use a strap boss just above the existing joints - at about the 23” mark on the level. But because of the fall I need I need to join lower.
There is an old inlet on the right but this looks to have been filled with mortar or something a long time ago. Don’t much fancy drilling into this. There’s a bit of space on the main pipe under this too - is that enough for the strap boss?
At some point I’ll renew the whole stack - but don’t have the cash to do that right now and this new connection is kind of urgent…
Any suggestions?
Many thanks
Keith