Hi all, I have a question regarding the RCD protection in my consumer unit, photo attached.
My understanding is that the MCBs in positions 1, 2, 3 and 4 are not protected by an RCD, as per the regs of the time. I would like to protect these circuits, in particular number 2, as we've recently had a bedroom converted into a bathroom and the sparks put new wiring, downlights and an extractor fan in running off the existing number 2 circuit. They also fitted a heated LED mirror cabinet with a built in shaver port, also running off the lighting circuit. It concerns me that this isn't protected by an RCD, especially as it is of metal construction and is touched daily by the whole family.
The shower circuit in position 7 is no longer used as we have switched to a boiler fed shower.
My question is, now that the electric shower is out of commission, can the CU be rejigged by moving the right hand RCD so that it protects all of the circuits to the right of it? Alternatively, would there be any be problem with rewiring the position 2 light circuit and B10 MCB into the space currently occupied in position 7?
My understanding is that the MCBs in positions 1, 2, 3 and 4 are not protected by an RCD, as per the regs of the time. I would like to protect these circuits, in particular number 2, as we've recently had a bedroom converted into a bathroom and the sparks put new wiring, downlights and an extractor fan in running off the existing number 2 circuit. They also fitted a heated LED mirror cabinet with a built in shaver port, also running off the lighting circuit. It concerns me that this isn't protected by an RCD, especially as it is of metal construction and is touched daily by the whole family.
The shower circuit in position 7 is no longer used as we have switched to a boiler fed shower.
My question is, now that the electric shower is out of commission, can the CU be rejigged by moving the right hand RCD so that it protects all of the circuits to the right of it? Alternatively, would there be any be problem with rewiring the position 2 light circuit and B10 MCB into the space currently occupied in position 7?
