What would the recommendation be for mounting the below 6U 500 deep cabinet to a stud wall?! Each side has 2 holes at the top but only the outer 2 are 16 inch centres which i believe should hit the studs in the wall.
What fixings are best to use, and should I mount ply first and drill additional fixings through the bottom corners of the cab or will it weaken the integrity.
Just 2 fixings doesnt seem enough to me to hold the weight of switch, CCTV NVR etc.
What fixings are best to use, and should I mount ply first and drill additional fixings through the bottom corners of the cab or will it weaken the integrity.
Just 2 fixings doesnt seem enough to me to hold the weight of switch, CCTV NVR etc.

