I laid my first concrete edging piece and I don’t think I have the the fall correct from the word go. I’m Laying an Indian stone patio
It’s a 2.7m x 4m patio but the fall is going to be on the 2.7m from front to back
I’ve installed my first flat top edge (there is a gap under spirit level as it’s not 100% flat)
I feel that maybe the fall should be bigger (the spirit level shown is 1.8m long and the first edge is 92xm long, so the spirit level would show the slope over the 1.8m length based on the angle of the current edge
Am I overthinking this? Should I rip it up and start again or will a 1cm fall over 2.7m length suffice?
It’s a 2.7m x 4m patio but the fall is going to be on the 2.7m from front to back
I’ve installed my first flat top edge (there is a gap under spirit level as it’s not 100% flat)
I feel that maybe the fall should be bigger (the spirit level shown is 1.8m long and the first edge is 92xm long, so the spirit level would show the slope over the 1.8m length based on the angle of the current edge
Am I overthinking this? Should I rip it up and start again or will a 1cm fall over 2.7m length suffice?