New member so I hope this is the right place to post.
We're getting an external boiler and we need a concrete foundation laying for it in the garden along the side of the house.
It needs to be 1 metre by 1 metre and around 40cm deep.
We've been quoted £330 (including materials) by a builder who's a friend of a friend. I know it'll mean he's working over two days as he's building it one day and then coming back to take the shuttering off the following day but it was a bit more than we'd expected.
Its been ages since we had any kind of building work done so I'm out of touch but does it seem about right or excessive?
We're getting an external boiler and we need a concrete foundation laying for it in the garden along the side of the house.
It needs to be 1 metre by 1 metre and around 40cm deep.
We've been quoted £330 (including materials) by a builder who's a friend of a friend. I know it'll mean he's working over two days as he's building it one day and then coming back to take the shuttering off the following day but it was a bit more than we'd expected.
Its been ages since we had any kind of building work done so I'm out of touch but does it seem about right or excessive?