Question, im getting very confused. We have a semi-detached with a dormer being built. My question is about fire regs. Does the dormer need to have 30 mins or 60mins fire rating? I'm referring to the cheek closest to the neighbour's roof. It will be about 500mm from their roof boundary

Im my mind it has to be 30mins at least, but is this done with 18mm Ply\Cement board? or do tiles count as the fire rating externally? The intention is probably to clad it, but I see the options are limited. Everything I read is confusing, as places say tiles dont count as they could crack or dislodge in a fire, or flames\heat could pass through the tile spacing.

Help ? Thanks
 
This is a building control question. I think it's 30 mins, but you need to take the inspector's guidance, not mine.
 
so in the building regs it looks like they are asking for 60mins. The Dormer is being put into a 1960s semi. The designer has put 30mins in their plans, its trying to understand who is right
 
It reads like they are implying the fire rating has been inside and out. So im guessing its just another layer of Suplux or Cement board?
 
Speak to your BC inspector.
Many times I was simply asked for fire resistant plasterboard lining.
Other times cement board which worked perfectly if you're having a bathroom built there.
Ultimately, your BC inspector will be the one giving the green thumb, so ask him.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top