Double check details for laying Quick Step LVT

Joined
22 Jan 2011
Messages
27
Reaction score
0
Location
Gloucestershire
Country
United Kingdom
Hi,
Planning on laying LVT (about 29 sq meters) over our current (worn) floorboards for living room and hallway which we had sanded and waxed years ago.

We plan to ply all of it to 9.5mm so that it will be level with the tiled kitchen and maybe eventually lay LVT in the kitchen in the future. So far I have to buy as follows:

Subfloor Reisser Pozi Screws 4.0 x 20mm
Plywood 1220 * 2440 * 9.5mm

Underlay Quick Step Sun heat underlay (Rooms are south facing so can get warm, not sure if require ??)
Aluminium Foil Tape 50mm x 45m

LVT: Quick Step Balance Click
Concave blades - to cut boards
Pull Bar
Spacers

Skirting will be removed and then refitted - Yellow gripfill

Quickstep LVT Incizo Doorbar

Ok so anything I've missed ? Obviously going to do a floating floor, watched a load of youtube videos so fairly confident. I have a multitool to help cut door frames.

Thread is more for a sanity check really as I want to make sure I have everything prepped and ready to fit hopefully around the Christmas holidays.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top