Hi,
Planning on laying LVT (about 29 sq meters) over our current (worn) floorboards for living room and hallway which we had sanded and waxed years ago.
We plan to ply all of it to 9.5mm so that it will be level with the tiled kitchen and maybe eventually lay LVT in the kitchen in the future. So far I have to buy as follows:
Subfloor Reisser Pozi Screws 4.0 x 20mm
Plywood 1220 * 2440 * 9.5mm
Underlay Quick Step Sun heat underlay (Rooms are south facing so can get warm, not sure if require ??)
Aluminium Foil Tape 50mm x 45m
LVT: Quick Step Balance Click
Concave blades - to cut boards
Pull Bar
Spacers
Skirting will be removed and then refitted - Yellow gripfill
Quickstep LVT Incizo Doorbar
Ok so anything I've missed ? Obviously going to do a floating floor, watched a load of youtube videos so fairly confident. I have a multitool to help cut door frames.
Thread is more for a sanity check really as I want to make sure I have everything prepped and ready to fit hopefully around the Christmas holidays.
Planning on laying LVT (about 29 sq meters) over our current (worn) floorboards for living room and hallway which we had sanded and waxed years ago.
We plan to ply all of it to 9.5mm so that it will be level with the tiled kitchen and maybe eventually lay LVT in the kitchen in the future. So far I have to buy as follows:
Subfloor Reisser Pozi Screws 4.0 x 20mm
Plywood 1220 * 2440 * 9.5mm
Underlay Quick Step Sun heat underlay (Rooms are south facing so can get warm, not sure if require ??)
Aluminium Foil Tape 50mm x 45m
LVT: Quick Step Balance Click
Concave blades - to cut boards
Pull Bar
Spacers
Skirting will be removed and then refitted - Yellow gripfill
Quickstep LVT Incizo Doorbar
Ok so anything I've missed ? Obviously going to do a floating floor, watched a load of youtube videos so fairly confident. I have a multitool to help cut door frames.
Thread is more for a sanity check really as I want to make sure I have everything prepped and ready to fit hopefully around the Christmas holidays.