Just saying but "Clayware" & Salt Glaze are not the same. They are different.
In a number of posts the OP mentioned their "downpipe" they also mentioned their"downpipe/gutter" in their first post first sentence but they never referred to the pipe in question as a soil pipe or soil pipe stack or even as something that needed "soil stack work"?
No sweat but it is best to use the correct technical terminology?
In a number of posts the OP mentioned their "downpipe" they also mentioned their"downpipe/gutter" in their first post first sentence but they never referred to the pipe in question as a soil pipe or soil pipe stack or even as something that needed "soil stack work"?
No sweat but it is best to use the correct technical terminology?
Last edited:
