We've extended out , opening up back wall of house, with goalpost structure.
We had to put in a 600mm wide by 1m deep ‘ground beam’with steel cages then filling in with strong mix.
This is the hole stretch across back of original property
We have recently dug out the existing house, to get the insulation benefits and currently there's a new oversight
The ground beam in between these oversights never had any DPM
Im concerned this may be a potential issue with damp as the ground beam has no DPM
We had to put in a 600mm wide by 1m deep ‘ground beam’with steel cages then filling in with strong mix.
This is the hole stretch across back of original property
We have recently dug out the existing house, to get the insulation benefits and currently there's a new oversight
The ground beam in between these oversights never had any DPM
Im concerned this may be a potential issue with damp as the ground beam has no DPM