Would be grateful for people opinions on this situation I am in....
The Client has requested a 17th edition consumer unit upgrade due to a child receiving an electric In the house. I visited the house to get an idea of what's going on etc.. the gas and water main have a 6mm earth tagged onto them. However, the client has limited funds and can only afford a fuseboard change including testing. Will take an extra day to upgrade the bonding to 10mm as laminate flooring/concrete floors are everywhere! With the supply characteristics that's present, would I be able to leave it at 6mm. Tncs system, main fuse 60a 1361. Or could I put it as a limitation on the certificate? Upgrade of equipotential bonding to water main and gas main in 10mm could not be carried out at present???
Carl
Would be grateful for people opinions on this situation I am in....
The Client has requested a 17th edition consumer unit upgrade due to a child receiving an electric In the house. I visited the house to get an idea of what's going on etc.. the gas and water main have a 6mm earth tagged onto them. However, the client has limited funds and can only afford a fuseboard change including testing. Will take an extra day to upgrade the bonding to 10mm as laminate flooring/concrete floors are everywhere! With the supply characteristics that's present, would I be able to leave it at 6mm. Tncs system, main fuse 60a 1361. Or could I put it as a limitation on the certificate? Upgrade of equipotential bonding to water main and gas main in 10mm could not be carried out at present???
Carl