Earth sleeve diameter

There are a few countries where the Earth conductor in "Twin and Earth" (etc.) TPS cables is already "insulated/sheathed", to the same standard as the Line and Neutral conductors - so "sleeving" of the Earth is unnecessary.
(The conductors (greater than 1 mm CSA] in TPS cables in these countries are also stranded, making their use much easier.)

Strange it is that more countries do not follow this practice, which is achieved in the countries concerned at a very small additional cost for the cable but which saves time when these cables are installed!
I.S. 201 cables are solid core upto and including 2.5mm^2
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top