Hi all,
Thought I would show some pictures of my en-suite bathroom I completed. Took me from October 09 to Christmas eve 09 (weekend working as I have a full time job through the week). Major brownie points from the missus for completing before Christmas.
I did everything apart from skimming the ceiling.
I think the biggest success is the travertine tiles, although they were a nightmare to do (the missus was very good at tiling as she has more patience and eye for detail than I do).
Thanks to everyone that helped me with my queries on here whilst I was working on it.
Final Pic:
Thought I would show some pictures of my en-suite bathroom I completed. Took me from October 09 to Christmas eve 09 (weekend working as I have a full time job through the week). Major brownie points from the missus for completing before Christmas.
I did everything apart from skimming the ceiling.
I think the biggest success is the travertine tiles, although they were a nightmare to do (the missus was very good at tiling as she has more patience and eye for detail than I do).
Thanks to everyone that helped me with my queries on here whilst I was working on it.
The cupboard
The cupboard used to house the header tank. This was removed when we had a combi-boiler...
Nearly there!
I used ivory coloured grout for the tiles. Wooden Laminate flooring sealed on the click joints...
Final Pic: