I've recently relocated my landing light but I had to extend the cables. In total 3 lives, 3 neutrals and 3 earth's from three 3 core cables.
I'm just hoping someone could let me know if what I've done is acceptable or if I should have done this in another way?
I joined each cable by twisting the 2.5 mm wire together. Over and under and used heat shrink sleeves over each individual wire join, each live, each neutral etc. I then used larger heat shrink sleeve for each 3 core cable so that the grey sheath that in cases the 3 wires is Un breached.
Ultimately is this safe or should I redo it?
Thanks
I'm just hoping someone could let me know if what I've done is acceptable or if I should have done this in another way?
I joined each cable by twisting the 2.5 mm wire together. Over and under and used heat shrink sleeves over each individual wire join, each live, each neutral etc. I then used larger heat shrink sleeve for each 3 core cable so that the grey sheath that in cases the 3 wires is Un breached.
Ultimately is this safe or should I redo it?
Thanks