If you were to extend a ring main, instead of using a JB under floor you extend using insulated crimps with rachet crimper. Is any other form of protect required, ie heat sleeving or put joint inside a small length of conduit to cover joint and provide mechanical protection? Would it be ok to just crimp with the ins crimps? Please spread sum light