- Joined
- 5 Dec 2012
- Messages
- 927
- Reaction score
- 13
- Country
As above, just a few questions on my bathroom refit
1. Do i install finished floor before or after shower tray?
2. I am going to install the sink waste pipe 'amongst the stud wall, but do i plasterboard stud wall before cutting holes and installing waste pipe that bottle trap will connect to, for sink?
3. Is it reccomended to board all the way to the floor before installing shower tray?
Thanks
1. Do i install finished floor before or after shower tray?
2. I am going to install the sink waste pipe 'amongst the stud wall, but do i plasterboard stud wall before cutting holes and installing waste pipe that bottle trap will connect to, for sink?
3. Is it reccomended to board all the way to the floor before installing shower tray?
Thanks