My mind is a boggle with everything I've got on the go at once.
Currently my floor is up and joists exposed as I am levelling it. I am installing a new bathroom comprising of a 1200. X 700 shower tray/enclosure, a wall hung semi pedestal (going on stud wall) and a new toilet remaining in same place as it is now.
Can I just confirm the order of everything?
As my floor is exposed joists, I plan on first fix water supply and bringing the pipework up through the floor alongside stud wall as I will be boxing in the water pipes and shower waste pipe.
I assume I install noggins for semi pedestal before boarding up?
I want to bring my basin waste down into my shower waste. Should my basin waste be 32mm pipe? And shower waste 40mm? Is there a t connector you can get to connect my vertical 32mm pipe into a horizontal 40mm pipe run?
On a semi pedastal i believe the waste pipe will run down through stud wall - then do I bring the waste out of the wall and connect into horizontal shower run at floor level so it will be boxed in?
Currently my floor is up and joists exposed as I am levelling it. I am installing a new bathroom comprising of a 1200. X 700 shower tray/enclosure, a wall hung semi pedestal (going on stud wall) and a new toilet remaining in same place as it is now.
Can I just confirm the order of everything?
As my floor is exposed joists, I plan on first fix water supply and bringing the pipework up through the floor alongside stud wall as I will be boxing in the water pipes and shower waste pipe.
I assume I install noggins for semi pedestal before boarding up?
I want to bring my basin waste down into my shower waste. Should my basin waste be 32mm pipe? And shower waste 40mm? Is there a t connector you can get to connect my vertical 32mm pipe into a horizontal 40mm pipe run?
On a semi pedastal i believe the waste pipe will run down through stud wall - then do I bring the waste out of the wall and connect into horizontal shower run at floor level so it will be boxed in?