Hi all
Getting a new bottom right winder staircase built which has a newel post on the left hand side. This will sit on top on existing parquet flooring with concrete underneath.
Does the newel post need to be fixing into the ground, and if so what method is the best?
Thanks
Getting a new bottom right winder staircase built which has a newel post on the left hand side. This will sit on top on existing parquet flooring with concrete underneath.
Does the newel post need to be fixing into the ground, and if so what method is the best?
Thanks