Please advise.
I am changing my combi boiler, the flow & return on the new replacement combi are on different sides to that of the old existing one. To make life easier, is it acceptable to use 22mm easy bend (ridges on it type) copper pipe (available from B&Q in 2 foot sections) for the final lead up to the boiler ?
Presumably plastic and flexible braided types are no good.
ZP.
I am changing my combi boiler, the flow & return on the new replacement combi are on different sides to that of the old existing one. To make life easier, is it acceptable to use 22mm easy bend (ridges on it type) copper pipe (available from B&Q in 2 foot sections) for the final lead up to the boiler ?
Presumably plastic and flexible braided types are no good.
ZP.
