Hi everyone
After laying a floor screed, do I have to cover it with anything - sheeting etc whilst its drying and how soon afterwards could you safely walk over a 50mm screed. I did ask in an earlier post about drying times but that was for a 85mm screed.
I would be grateful for any advice
Thank you
After laying a floor screed, do I have to cover it with anything - sheeting etc whilst its drying and how soon afterwards could you safely walk over a 50mm screed. I did ask in an earlier post about drying times but that was for a 85mm screed.
I would be grateful for any advice
Thank you