Hi Guys,
I am in the process of replacing the shower in my daughter's house with a 9.5 Kw model.The current feed is 6mm T+E and I am upgrading this to 10mm (about 7m run).
At the same time, I want to replace the existing single-way fused unit serving the shower with an RCD/MCB unit. The fused unit, seems to feed (in some way) from the main consumer unit (old cartridge fuse type), to which it is immediately adjacent. Can I do this work safely, or does it involve work on the meter tails, which clearly, I would not entertain. I intend to get the work certified upon completion to meet Part P regs etc.
Thanks in anticipation,
Banjoking
I am in the process of replacing the shower in my daughter's house with a 9.5 Kw model.The current feed is 6mm T+E and I am upgrading this to 10mm (about 7m run).
At the same time, I want to replace the existing single-way fused unit serving the shower with an RCD/MCB unit. The fused unit, seems to feed (in some way) from the main consumer unit (old cartridge fuse type), to which it is immediately adjacent. Can I do this work safely, or does it involve work on the meter tails, which clearly, I would not entertain. I intend to get the work certified upon completion to meet Part P regs etc.
Thanks in anticipation,
Banjoking