Builders hand excavated footing to bring property line forward.PP approved. BC plan is to pour concrete 700mm in trench 1m deep.
I am waiting for heat pump to be installed in Jan. Order confirmed. I cannot wait for extension to complete after then.
What do I do with gas service pipe. Can it be sleeved. I intend to get meter removed by Octopus and then cadent to move the service pipe outside. But i need gas supply until 2nd week of Jan and property extension to be completed by then.
Currently service pipe comes into property through brick foundation then through a 6inch concrete slab into garage. Uts been like this for past 15 yrs i bought house and looks like since 1965 as neighbours dont recollect any changes to my house.
Garage converted into kitchen. Smart meters.
I am waiting for heat pump to be installed in Jan. Order confirmed. I cannot wait for extension to complete after then.
What do I do with gas service pipe. Can it be sleeved. I intend to get meter removed by Octopus and then cadent to move the service pipe outside. But i need gas supply until 2nd week of Jan and property extension to be completed by then.
Currently service pipe comes into property through brick foundation then through a 6inch concrete slab into garage. Uts been like this for past 15 yrs i bought house and looks like since 1965 as neighbours dont recollect any changes to my house.
Garage converted into kitchen. Smart meters.