An existing kitchen concrete floor will be removed to make way for a floating floor with underfloor heating that will also run into the extension. What is going to be the best floor construction to ensure this goes as smoothly as possible. I.e. getting the levels to match between existing and new extension floor so that the new floating floor will be correct along with the heating and insulation under. Ground bearing slab or Beam and block to the extension?
Thanks, Simon.
An existing kitchen concrete floor will be removed to make way for a floating floor with underfloor heating that will also run into the extension. What is going to be the best floor construction to ensure this goes as smoothly as possible. I.e. getting the levels to match between existing and new extension floor so that the new floating floor will be correct along with the heating and insulation under. Ground bearing slab or Beam and block to the extension?