Hi guys,
Had a full GRP rip-out and reconstruct 6 months ago by my builder (as part of the bigger renovation), but it’s already leaking.
The builders tried sealant on the brickwork edges and said they will add some metal capping to it (which has not arrived), but the leak persists. It also raised a red flag, as I question why they have left the edges exposed. I'm concerned about the skylight installation—it's basically flush at the top edge, causing water to pool (see photo).
This was signed off by private building control but I’m questioning if this is actually up to code (specifically the lack of a proper upstand).
Questions:
Had a full GRP rip-out and reconstruct 6 months ago by my builder (as part of the bigger renovation), but it’s already leaking.
The builders tried sealant on the brickwork edges and said they will add some metal capping to it (which has not arrived), but the leak persists. It also raised a red flag, as I question why they have left the edges exposed. I'm concerned about the skylight installation—it's basically flush at the top edge, causing water to pool (see photo).
This was signed off by private building control but I’m questioning if this is actually up to code (specifically the lack of a proper upstand).
Questions:
- From the photo, does this look like a compliant install?
- If it's a fail, how do I best challenge a private BC "Final Certificate"? Do I go back to them or involve the Local Authority for an informal view? More just want to get an official opinion to avoid the back and forth with the builder