Now on to plan C for the fireplace multi fuel stove.. Think this is the final plan.
The builders opening is going to be rendered and then 12mm Hardie backer applied which eventually will be tiled with brick slips when my daughter can afford this (thanks to 'maltaron' for this suggestion).
What is the best adhesive for this (Screwfix if poss as local) or do I need to use screws. or both?
Also the panels are 1200 x 800 and the fire back is 1120 x 940 so will need to join this one. Any problems doing this?
Thank you very much.
Just thought. Make the joint vertical or horizontal?
The builders opening is going to be rendered and then 12mm Hardie backer applied which eventually will be tiled with brick slips when my daughter can afford this (thanks to 'maltaron' for this suggestion).
What is the best adhesive for this (Screwfix if poss as local) or do I need to use screws. or both?
Also the panels are 1200 x 800 and the fire back is 1120 x 940 so will need to join this one. Any problems doing this?
Thank you very much.
Just thought. Make the joint vertical or horizontal?